Morning all. Just had a quote for a new boiler and I was wondering how it looks? My old boiler is ancient and lives outside. Regulations mean it has to be moved inside which is adding to the costs as all my pipes will have to be changed.
Option 1
1.To drain down and remove from site 1 nuraber existing floor standing heating boiler including the hot water storage cylinder and all redundant cold water storage tanks.
2.To supply and install 1 nuraber 35kw Ideal or 37kw Worcester Bosch corabination boiler into the 1st floor airing cupboard including all the interconnecting pipe work and a new 22mm gas supply run to the new boiler position.
3. To remove and link out the shower pumps.
4.To flush the existing heating system and dose with a chemical inhibitor on completion.
5.To supply and install digital wireless room stat.
6.To certify on completion.
Cost. £3,420.00
Option 2
1.To drain down and remove from site 1 nuraber existing floor standing heating boiler including the hot water storage cylinder and all redundant cold water storage tanks.
2.To supply and install 1 nuraber 24kw heat only boiler into the 1st floor airing cupboard including all the interconnecting pipe work and a new 22mm gas supply run to the new boiler position.
3.To remove and link out the shower pump.
4.To supply and install 1 nuraber 210lt unvented water heater into the airing cupboard.
5.To flush the existing heating system and dose with a chemical inhibitor on completion.
6.To supply and install digital wireless room stat.
7.To certify on completion.
Cost. £ 3,900.00
How do these look? House has 3 floors and 2 bathrooms.
Option 1
1.To drain down and remove from site 1 nuraber existing floor standing heating boiler including the hot water storage cylinder and all redundant cold water storage tanks.
2.To supply and install 1 nuraber 35kw Ideal or 37kw Worcester Bosch corabination boiler into the 1st floor airing cupboard including all the interconnecting pipe work and a new 22mm gas supply run to the new boiler position.
3. To remove and link out the shower pumps.
4.To flush the existing heating system and dose with a chemical inhibitor on completion.
5.To supply and install digital wireless room stat.
6.To certify on completion.
Cost. £3,420.00
Option 2
1.To drain down and remove from site 1 nuraber existing floor standing heating boiler including the hot water storage cylinder and all redundant cold water storage tanks.
2.To supply and install 1 nuraber 24kw heat only boiler into the 1st floor airing cupboard including all the interconnecting pipe work and a new 22mm gas supply run to the new boiler position.
3.To remove and link out the shower pump.
4.To supply and install 1 nuraber 210lt unvented water heater into the airing cupboard.
5.To flush the existing heating system and dose with a chemical inhibitor on completion.
6.To supply and install digital wireless room stat.
7.To certify on completion.
Cost. £ 3,900.00
How do these look? House has 3 floors and 2 bathrooms.