The Economic Regulation Authority denied Western Power money to build transmission works so that the grid could be connected to the wind farm at a cost of $21.7M.
The wind farm costs $750M and bureaucracy squabbling over a paltry $21.7M to connect it to the grid, will this become another white elephant?
The wind farm costs $750M and bureaucracy squabbling over a paltry $21.7M to connect it to the grid, will this become another white elephant?