T
TECHNOKID
Guest
The problem with those HD jobs is simply that they are given as subcontract to jobbers and often (note the world often as it isn't always the case), the labor isn't always (note again always as it isn't always the case) qualified in order to provide the cheapest labor cost possible. The so called technician(s) also has to spend a very short time on site otherwise if the opposite happens to often, he will definitely get told as in order to make as much money as possible, they have to maximise the installs/calls done within the same day. We also have to give the benefit of the doubt as when making cable terminations, even the best technician can fail at times. However, leaving the old type cabling is totally unacceptable. I realise that using old cabling isn't so much the cable cost but ratter time consuming which drops the profit since labor is the actual big cost for the jobber(s). Using the old cabling is chasing for problems to occur therefore, consumers should request NEW cabling ALL the way throught the entire new circuit path and make sure this is WRITTEN black on white on the contract. Before you sign anything, MAKE SURE you INSPECT the job!
This is the main reason, I will NOT let any outsider touch any of my cabling (inside the house I mean) as ALL I will allow the company is to do the connection up to the outside of my house onlyand will PERSONNALLY do anything related to any inside jobs.
As pointed out, on many occasions outside providers are used therefore, if this is the case doing as Pinza points out (complaint) could well be of service to the company as they can change only what they know! If their subcontractor is believed to do this type of job repitively, they'll be able to change accordingly!
H.N.Y!
Ren
This is the main reason, I will NOT let any outsider touch any of my cabling (inside the house I mean) as ALL I will allow the company is to do the connection up to the outside of my house onlyand will PERSONNALLY do anything related to any inside jobs.
As pointed out, on many occasions outside providers are used therefore, if this is the case doing as Pinza points out (complaint) could well be of service to the company as they can change only what they know! If their subcontractor is believed to do this type of job repitively, they'll be able to change accordingly!
H.N.Y!
Ren