Can anyone help with a surveying question?

Abdul

New member
Hello all

I was wondering if there was someone out there who could help me with some surveying questions.

A short while ago I undertook a level survey of both the left & right side of a pavement to determine how high the pavement was in relation to a TBM, the TBM was a corner of a lamp post.

I commenced by taking 12 levels along the left hand side of the pavement during which I carried out 3 change points. I then surveyed 10 points on the right hand side of the pavement and again I carried out 3 change points. I ended the survey by taking a level back at my TBM.

The problem is; I have been asked to extend this survey to include 5 additional points on the left hand side and 8 addition points on the right hand side of my pavement & tie the extended survey to an ordnance bench mark. How do I do this???

Can anyone help?

Thank you in advance.
 