Hello all
I was wondering if there was someone out there who could help me with some surveying questions.
A short while ago I undertook a level survey of both the left & right side of a pavement to determine how high the pavement was in relation to a TBM, the TBM was a corner of a lamp post.
I commenced by taking 12 levels along the left hand side of the pavement during which I carried out 3 change points. I then surveyed 10 points on the right hand side of the pavement and again I carried out 3 change points. I ended the survey by taking a level back at my TBM.
The problem is; I have been asked to extend this survey to include 5 additional points on the left hand side and 8 addition points on the right hand side of my pavement & tie the extended survey to an ordnance bench mark. How do I do this???
Can anyone help?
Thank you in advance.
I was wondering if there was someone out there who could help me with some surveying questions.
A short while ago I undertook a level survey of both the left & right side of a pavement to determine how high the pavement was in relation to a TBM, the TBM was a corner of a lamp post.
I commenced by taking 12 levels along the left hand side of the pavement during which I carried out 3 change points. I then surveyed 10 points on the right hand side of the pavement and again I carried out 3 change points. I ended the survey by taking a level back at my TBM.
The problem is; I have been asked to extend this survey to include 5 additional points on the left hand side and 8 addition points on the right hand side of my pavement & tie the extended survey to an ordnance bench mark. How do I do this???
Can anyone help?
Thank you in advance.