Hello I was trying to make a pass through in the middle of this wall and smack in the middle after opening the wall I find the cast iron drain pipe going to the ceiling. I would like to have the center of the wall to have a roughly 35" across opening and the drain pipe is in the way by about 8". My question is can I cut the pipe lower down below the new opening and reroute it back up to the remainder of the pipe that leads to the roof? Pic on the link below. Thanks!
http://picasaweb.google.com/lh/photo/IL3BOVkGYTi3h2u1X4xMa4xkkz-PHgemoeCud4hKY-Q?feat=directlink
http://picasaweb.google.com/lh/photo/IL3BOVkGYTi3h2u1X4xMa4xkkz-PHgemoeCud4hKY-Q?feat=directlink