Required Rate of Return (IRR) on CAPM model?

Jaycee Martinez

New member
A project under consideration has an internal rate of return (IRR) of 15%, and a beta of 0.6. The risk free rate is 4%, and the expected rate of return on the market portfolio is 10%.

What is the required rate of return for this project according to the CAPM?

Looking for steps on how to calculate with the answer. Will have a lot of these on test and having a very difficult time with this model of finance structure.
 