what are the steps to calculate this accounting equation?
Mackie Co. manufactures hunting clothing. The standard variable costs to produce one batch of the Big Mac vests are as follows: direct material average cost is $6 per yard; average yards per batch is 20; direct labor average rate per hour is $12; average hours per batch is 4; variable overhead average rate per hour is $8; average hours per batch is 4. The standard monthly fixed costs are as follows: manufacturing overhead is $3,200; selling and administrative costs are $1,900. Mackie Co. produces 100 batches per month. (Ten vests are produced in each batch.) What is the manufacturing cost per vest?
Mackie Co. manufactures hunting clothing. The standard variable costs to produce one batch of the Big Mac vests are as follows: direct material average cost is $6 per yard; average yards per batch is 20; direct labor average rate per hour is $12; average hours per batch is 4; variable overhead average rate per hour is $8; average hours per batch is 4. The standard monthly fixed costs are as follows: manufacturing overhead is $3,200; selling and administrative costs are $1,900. Mackie Co. produces 100 batches per month. (Ten vests are produced in each batch.) What is the manufacturing cost per vest?