Search results

  1. P

    In order to efficiently bid on a contact, a contractor wants to be 95%...

    ...confident that his error is less than t? In order to efficiently bid on a contact, a contractor wants to be 95% confident that his error is less than two hours in estimating the average time it takes to install tile flooring. Previous contracts indicate that the standard deviation is 4.5...
  2. P

    A random sample of 40 students has a test score with a mean of 8.15 and standard...

    ...deviation of 10.2. Consturct? A random sample of 40 students has a test score with a mean of 8.15 and standard deviation of 10.2. Construct the confidence interval for the population mean if c=0.90
Back
Top